Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 28 results ...

Babatunde, S O and Perera, S (2017) Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria. Engineering, Construction and Architectural Management, 24(06), 875-900.

Beitelmal, W, Molenaar, K R, Javernick-Will, A and Pellicer, E (2017) Challenges and barriers to establishing infrastructure asset management: A comparative study between Libya and the USA. Engineering, Construction and Architectural Management, 24(06), 1184-202.

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(06), 920-34.

  • Type: Journal Article
  • Keywords: risk management; project management; construction planning
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-05-2016-0117
  • Abstract:
    Purpose Mega-projects (MP) are important not only to the stakeholders involved in their development and construction, but also to the societies, economies, and environments impacted by them. Given the importance of MP and the prevailing trend toward poor performance, the purpose of this paper is to identify changes in project development and execution to increase the likelihood of success on MP. Design/methodology/approach The researchers performed an extensive literature review in the initial phase. Then, interviews with experienced mega-project professionals were conducted to gather information on factors contributing to success and failure on MP. A detailed survey was then carried out to quantify and assess the frequency and impact levels of these factors. Finally, case studies were performed to analyze the manifestations of these impact factors on MP and identify mitigation strategies. Findings After gathering data from more than 100 projects, the researchers identified and prioritized 34 factors that have high frequency and negative performance impacts on MP, categorizing them into five categories. These factors were then used to create a mega-project preparedness assessment process and a lessons learned repository around these factors, which includes factor descriptions, examples from actual projects, and recommendations. The result is a structured method for enabling comprehensive mega-project risk management and mitigation planning. Originality/value The research has gone beyond any previous generic lessons learned, to enable project teams to make structured assessments of critical mega-project impact factors. Assessing these impact factors will enable more accurate and thorough mitigation planning for them and, thus, improve mega-project performance.

Chan, A P C, Wong, F K W, Hon, C K H, Ali, J A and Lyu, S (2017) Construction safety and health problems of ethnic minority workers in Hong Kong. Engineering, Construction and Architectural Management, 24(06), 901-19.

Dada, J O (2017) An appraisal of paradigm shifts required of competence of the Nigerian quantity surveyors. Engineering, Construction and Architectural Management, 24(06), 1269-80.

Damci, A, Arditi, D and Polat, G (2017) Civil engineers’ personal values/demographics linkage in project team building. Engineering, Construction and Architectural Management, 24(06), 1337-49.

de Paula, N, Arditi, D and Melhado, S (2017) Managing sustainability efforts in building design, construction, consulting, and facility management firms. Engineering, Construction and Architectural Management, 24(06), 1040-50.

Edirisinghe, R, London, K A, Kalutara, P and Aranda-Mena, G (2017) Building information modelling for facility management: Are we there yet?. Engineering, Construction and Architectural Management, 24(06), 1119-54.

El-Hamrawy, S A-K, Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(06), 988-1003.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(06), 950-67.

Hamzeh, F, Abdul, G O, Saleh, B M B and Abbas, Y (2017) Modular concrete construction: The differing perspectives of designers, manufacturers, and contractors in Lebanon. Engineering, Construction and Architectural Management, 24(06), 935-49.

Jaeger, M, Yu, G and Adair, D (2017) Organisational culture of Chinese construction organisations in Kuwait. Engineering, Construction and Architectural Management, 24(06), 1051-66.

Koops, L, van Loenhout, C, Bosch-Rekveldt, M, Hertogh, M and Bakker, H (2017) Different perspectives of public project managers on project success. Engineering, Construction and Architectural Management, 24(06), 1294-318.

Mosley Jr, J C and Bubshait, A A (2017) Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia: An empirical assessment. Engineering, Construction and Architectural Management, 24(06), 1004-17.

Nikmehr, B, Hosseini, M R, Rameezdeen, R, Chileshe, N, Ghoddousi, P and Arashpour, M (2017) An integrated model for factors affecting construction and demolition waste management in Iran. Engineering, Construction and Architectural Management, 24(06), 1246-68.

Osei-Kyei, R and Chan, A P C (2017) Empirical comparison of critical success factors for public-private partnerships in developing and developed countries: A case of Ghana and Hong Kong. Engineering, Construction and Architectural Management, 24(06), 1222-45.

Ritson, N H, Wilson, M M J and Cohen, D A (2017) Managing engineering contractors in the UK petrochemicals industry. Engineering, Construction and Architectural Management, 24(06), 1067-80.

Senaratne, S, Jin, X-H and Balasuriya, K (2017) Exploring the role of networks in disseminating construction project knowledge through case studies. Engineering, Construction and Architectural Management, 24(06), 1281-93.

Sepasgozar, S M E and Loosemore, M (2017) The role of customers and vendors in modern construction equipment technology diffusion. Engineering, Construction and Architectural Management, 24(06), 1203-21.

Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(06), 968-87.

Teo, A L E, Ofori, G, Tjandra, I and Kim, H (2017) Framework for productivity and safety enhancement system using BIM in Singapore. Engineering, Construction and Architectural Management, 24(06), 1350-71.

Tran, D Q, Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(06), 1319-36.

Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(06), 1155-69.

Venselaar, M and Wamelink, H (2017) The nature of qualitative construction partnering research: Literature review. Engineering, Construction and Architectural Management, 24(06), 1092-118.

Vu, H A, Cu, V H, Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(06), 1018-39.

Wang, C, Li, B, Li, B and Baldwin, A (2017) Case study of “project controlling” on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(06), 862-74.

Yu, A T W (2017) Using jigsaw method to enhance the learning of research and consultancy techniques for postgraduate students. Engineering, Construction and Architectural Management, 24(06), 1081-91.

Yu, J, Ma, G and Jiang, X (2017) Impact of the built environment and care services within rural nursing homes in China on quality of life for elderly residents. Engineering, Construction and Architectural Management, 24(06), 1170-83.